In may 2015 construction began on the station "Strelka", was conducted the development and profiling of the construction site, was created underground chamber for the tunnel complexes and in 22 december 2015 in the right main line tunnel with a length of 2074m began excavation to the cameras of congresses in front of the station "Moskovskaya" with tunnel shield Herrenknecht "Tatiana". The construction of the station should be completed in 2018.
his09